Actus / Discrepancy reporting

Gate the fix by how bad it is.

Record discrepancy, problem and failure reports with a severity, and require containment, root cause and a signed corrective action plan for the severities you choose.

01 / Reports & severity

Three report types, one workflow.

Discrepancy Report, Problem Report and Failure Report each have their own workflow with the same statuses: Open, In Progress, Resolved, Closed and Rejected. Severity follows a P1 to P5 scheme that you can edit, and the defect type catalog (Design, Code, Test, Process and Environment by default) is yours to change. The list shows severity, defect type, whether a root cause is recorded, the corrective action sign-off and a transition menu per row.

  • Discrepancy, problem and failure reports
  • Editable P1 to P5 severity levels and defect types
  • Root cause, sign-off and verification at a glance
Discrepancy list of the GNC project with seven reports, severities Priority 1 to 5, defect types, root cause flag, corrective action sign-off by Dana Whitfield and a Transition menu per row
02 / Gates

Containment, root cause and a signed plan.

For each severity you choose, a report cannot leave Open until a containment action with an owner is signed, and cannot be resolved without a root cause and a signed corrective action plan. Editing the corrective action invalidates its sign-off, so the plan has to be signed again. Sign-offs re-authenticate the signer. Severities you do not gate move through the workflow freely.

  • Signed containment before leaving Open
  • Root cause and signed corrective action before Resolved
  • Gates chosen per severity level
GNC-5 resolved Priority 1 report with its root cause, corrective action and containment action each with a sign-off, Sign corrective action and Sign containment buttons, and two comments
03 / Verification

Close it with evidence.

Lucent

Review before closure

Where Lucent is enabled, a gated report can require a linked, completed Lucent review before it can be closed.

Integrations →
NexusRM

Tests before closure

Where NexusRM is enabled, a gated report can require a linked NexusRM test execution whose status is one of your configured passing statuses.

Integrations →
Always available

On every project

The three report types and the default severity levels exist on every project whatever its template, and the Discrepancies page is always in the project sidebar.